立博

  • Xinjiang LNG liquefaction plant 4MW power plant
  • Purpose:

    Gas Source:

    locations:

    Capacity:

    Work Scope:

    • DESCRIPTION


      项目介绍
      It includes a large ECU system, generator set controller IG-NTC, signal acquisition module, electronic speed regulation, display, DC power supply, etc. All unit control functions are centralized in this cabinet. Each unit is equipped with one local monitoring cabinet, which is placed on the unit side.
       
      Unit startup, speed regulation, automatic grid connection, power factor control, load addition and reduction
       
      Electricity measurement and display: U, 1, Hz, kW, kVA, PF, kWh
       
      Alarm and protection: overload/short circuit, overvoltage/undervoltage, overfrequency/underfrequency, reverse power, high winding temperature, overspeed, etc
       
      Collect various parameters of the unit, such as cylinder temperature, exhaust temperature, oil temperature, talent temperature, oil pressure, rotational speed, gas regulating valve opening, etc

    Service

    classification

    product

    recommendation

    Contact

    Information
    • Tel:0531-69953988
      13012995645
    • Add:101, Building 5, Liandong U Valley Science and Technology Innovation Center, Zhangjin Comprehensive Bonded Zone, No. 33688 Jingshi East Road, Suncun Street, Jinan Area, China (Shandong) Pilot Free Trade Zone

    截屏,微信识别二维码

  • 立博