The installation of biogas generator sets requires attention to the following points:
locations selection: Choose a flat and waterlogged area for installation, while considering the safe distance between the biogas generator unit and surrounding buildings.
Infrastructure: Ensure that the foundation is sturdy and stable, able to withstand the weight and vibration of the generator set. For large generator sets, specialized basic engineering design may be required.
Fuel supply: Ensure stable and reliable supply of biogas. During the installation process, it is necessary to establish a pipeline system for transporting biogas and check its sealing and safety.
Emission system: Install an effective emission system to ensure that exhaust gas can be treated reasonably and meet environmental requirements.
Cooling system: The generator set generates a large amount of heat during operation, and it is necessary to design and install a suitable cooling system to ensure the normal operation of the generator set.
Maintenance: Regularly inspect and maintain various components of the generator set to maintain their good condition and extend their service life.
Safety protection: Ensure that appropriate safety protection measures are in place around the generator set, including firefighting equipment, alarm systems, etc., to improve safety.
Legal compliance: Before installing biogas generator units, understand and comply with local laws, regulations, and rules to ensure compliance with relevant environmental and safety requirements.
In summary, the installation of biogas generator units requires comprehensive consideration of factors such as infrastructure construction, fuel supply, emission system, cooling system, maintenance, safety protection, and legal compliance to ensure that the generator units can operate safely and efficiently.